1

Penmann Ltd finalises specialist HVAC installation for Nutricia’s production facility in Liverpool in line with FSI Phase 1 and 2

News Discuss 
Penmann recently finalised a tailored HVAC upgrade at Nutricia’s Liverpool facility, supplying a purpose-built ventilation and climate control system engineered to meet stringent hygiene and production criteria. The contract included the complete lifecycle delivery of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based on https://socialevity.com/story22713567/the-penmann-team-completes-major-hvac-upgrade-for-nutricia-s-liverpool-site-to-align-with-the-fsi-development-programme

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story